The University of Warwick; WMG

Project: International Institute for Nanocomposites Manufacturing

Project Details

Building and Energy Efficiency Awards Finalist (2015)

Requirements

What We Did

Building and Energy Efficiency Awards Finalist (2015)

  • Design and build research and development facilities with complex electrical services and mechanical integration.
  • Bespoke powder coated steel dado trunking to the main processing hall
  • Small power wiring for outlets up to 125A TPN.
  • Emergency lighting via central battery system including addressable monitoring of individual sub-circuits and selective switching.
  • Architectural linear LED external lighting system to secondary cladding
  • Cat 6 structured cabling with re-wireable fire stopping devices
  • 100m2 roof mounted solar PV producing 11,400kWh and saving 6000kg of CO2 per year
Job Photos

Project Gallery

Get In Touch

Looking for an Electrical Contractor for your next project?

Call us on (0161) 620 2689


or